会员登录|免费注册|忘记密码|管理入口 返回主站||保存桌面|手机浏览|联系方式|购物车
企业会员第1年

江苏宏亚高空工程有限公司  
加关注0

通信终端设备

搜索
联系方式


请先 登录注册 后查看


新闻分类
  • 暂无分类
站内搜索
 
荣誉资质
  • 暂未上传
首页 > 公司新闻 > 绘画加固冷却塔施工
公司新闻
绘画加固冷却塔施工
2023-07-13IP属地 湖北26

  室外堆放时,应加以覆盖,防止雨雪对其造成损害。砌筑前,加气混凝土砌块应充分湿润,预砌墙体与原结构的连接处应浇水湿润,以保证砌体粘结牢固。冷却塔外墙粉刷加固时,不允许留脚、留手、留眼,门窗框安装应采用后堵式墙面粉刷。在墙的转角处或交接处,竖起测量杆,在测量杆之间拉准线。构造柱中,构造柱混凝土应在砌墙后浇筑,并按规定留出墙体。并加拉结筋。平整度、垂直度、 mortar joint thickness and mortar plumpness of masonry surface should meet the specification requirements. The structure of the connection between the aerated concrete block wall and the frame structure, the setting and structure of reinforcement, etc. shall comply with the design drawings. Safety wall painting technology for masonry wall painting: Before operation, it is necessary to check whether the operating environment meets the safety requirements, whether the roads are smooth, whether the machines and tools are intact and firm, and whether the safety facilities and protective equipment are complete. Construction of strengthening cooling tower by painting

  经检查符合要求后,方可进行墙面粉刷。打基础时,要注意基坑边坡土质的变化,有无坍塌。如有,应及时采取措施,处理后继续刷墙。堆放的砖石等材料应留在基坑边坡上缘以上。基坑较深时,应设置梯子上下,不允许攀爬。材料不得在砌体和支架上上下踩踏,油漆加强冷却塔施工不得触及挡土板支架。当墙体砌筑高度超过地面时。应该搭起脚手架。当脚手架在一层以上或高度超过时,必须设置安全网, 脚手架使用后应设置防护栏杆和踢脚板。冷却塔施工粉刷加固脚手架上堆放的材料数量不得超过规定的荷载,堆放的砖块高度不得超过皮侧砖,同一脚手架上的操作人员不得超过两人。粉刷地板墙面时,堆放机器、砖块等物品不得超过使用负荷。否则,需要在经验后采取有效的加固措施,方可堆放和刷墙。墙顶不准划线、刮擦、清洁墙面或检查大角度垂直墙上的油漆。切砖时要面向内,注意把碎砖挑出来,伤到人。吊笼、滑轮、绳索、刹车等。对于垂直运输必须满足载重要求,牢固无损, 并且起吊时一定不能超载,一定要经常检查,出现问题要及时处理。用塔吊吊砖时要用砖笼。