桥梁伸缩缝安装前期的施工准备工作
1.伸缩缝预留槽的设置:桥面铺装混凝土施工前,伸缩缝应用塑料泡沫板填实,防止混凝土等废弃物掉入,影响伸缩装置的性能;桥面铺装施工后,伸缩缝预留槽口应用低标号砂浆或混凝土填充至与桥面齐平,以保证表面沥青混凝土铺装的平整度,防止施工时预留钢筋受压变形,影响伸缩装置的安装。
2.伸缩缝预留槽的开挖:沥青混凝土上层完成后,即可进行伸缩缝开槽。首先,根据设计宽度,在表层放出切割边缘标记。可以先用水打湿表层,然后用胶带纸沿切割标线在伸缩缝两侧贴上塑料薄膜,再盖上一层硬塑料编织布,防止切割过程中污染路面。技术工人操作切割机沿标准线切割,保证切割缝整齐顺直。切割完成后,手动去除表面混合物。对于剩余凹槽内的填充物,可先用风镐将其打碎,然后用人工清除。 and care should be taken to prevent the corner of the slit from being damaged. Check whether the cement concrete under the asphalt concrete in the tank is dense. If it is suspended, it should be cut again along the standard line until the inner walls on both sides of the tank are flat and dense. The concrete surface in the tank is treated by manual roughening. Check whether the reserved reinforcement in the groove meets the design and installation requirements, especially the reserved reinforcement at the plate end, which is deformed during the prefabrication, transportation and installation of the beam and slab, adjust the reserved reinforcement that does not meet the requirements, and remove the concrete laitance attached to the surface of the reinforcement. Clean up the residue in the tank and check whether the plastic foam board in the seam is complete and continuous, 以及缝宽是否符合设计要求。预留槽可以用水枪彻底清洗干净。
衡水德越工程橡胶订购热线:赵经理(微信同步)